Cryo Pack 3000

Wessington Cryogenics - Manufacturer of cryogenic vessels for liquid nitrogen, argon, oxygen, helium and CO2
Home Up Awards Contents Training Courses Downloads Cryo Links Contact Us Terms Online Shop

 

Home
Up

CRYO PACK 3000 Series Tanks

 

The CRYO PACK 3000 tank has approvals for road, rail and sea transport. It also has DNV 2.7-1 / EN 12079 approval and is used for nitrogen work on oil rigs throughout the World.

The tank can be produced with working pressures ranging from 3 to 6 bar (46 psig to 90 psig) and can be used for the transport of liquid nitrogen, oxygen & argon.

 

The vessel also features high vacuum super-insulation, full set of decals (including logo’s where supplied by customer), pressure build system and various pipework options for maximum versatility.

SPECIFICATIONS

Specification

CRYO PACK 3000

3 Bar

CRYO PACK 3000

6 Bar

Capacity (Litres)

11,350

11,350

Pressure

3 Bar

6 Bar

Hydraulic Test Pressure

5.2 Bar(a)

9.1 Bar(a)

Tare Weight kg

6,000

6,445

Max Gross Weight (LN2) kg

14,750

15,200

Dimensions

Length (mm)

4200

Height (mm)

2591

Width (mm)

2438

Materials

Inner Shell

EN 10028 – 1.4301 - Stainless Steel

Outer Jacket

Carbon Steel (Grade 43D S275 J2G3)

Skid

Carbon Steel (Grade 50D S355 J2G3)

Pipework

ASME SA 240 Tp.316 Stainless Steel Sch.10 As Minimum

Paint Specification

Shot Blast SA 2.5, Zinc Rich Primer 50 microns, Epoxy High Build 125 microns, Polyurethane Top Coat 50 microns

Design Approval(s)*

ASME VIII, ADR/RID, IMDG, IMO, USDOT, DNV 2.7-1 / EN 12079

Performance

Maximum Evaporation Rate 0.5% per day

Holding Time

15 Days (6 Bar) / 35 Days (17 Bar)

Temperature

Inner Shell -196°C to +50°C, Outer Jacket -20°C to +50°C

Corner Castings*

ISO Standard 1161 Blair BLRC20100 / 20000

Couplings

To customer specifications

*              Design approvals may vary depending on options and Country of operation. For details, please contact Technical Department
 

Valves / Pipework

 


 

 

 

 

 

 

 

 

 

 

 

 

Tank schematic shows standard configuration, utilising Globe Valves.

Options :-

Option 1: Rear Fill direct to rear of tank allowing concurrent bottom fill / liquid decant (not shown)

Option 2: Rear Fill external to tank via main Tank Isolation Valve

Option 3: Top Fill arrangement with Line Blow Down & Line Relief

Option 2: Any of the above arrangements with Cryogenic Ball Valves as alternative to Globe Valves

V1

Liquid Isolation

RV1

Primary Relief

V2

Liquid Decant

RV2

Primary Relief

V3

Pump Return or Top Fill (via Option 3)

RV3

Road Relief

V4

Tricock Vent

RV4

Line Relief

V5

Tank Vent Valve

CI

Contents Indicator

V6

Travelling Valve

PG

Pressure Gauge

V7

Pressure Build

FI

Liquid Strainer

V8/V9/V10

Gauge Panel Control Valves

NRV

Check Valve

 

 

Couplings

To Customer Requirements

 

 

PBV

Pressure Build Vaporiser